Verify Parts: Ensure you have the Phoenix Contact distribution blocks:
Gather Tools:
Documentation:
Stack the Distribution Blocks:
Power Off the Machine:
Remove the Old Blocks:
Take Pictures:
Slide Out the Old Blocks:
Install the New Blocks:
Verify Parts:
Gather Tools:
Position the Cable:
Secure the Cable:
Repeat for All Corners: